ILLUMINARRPG: (5 - 1501, 1545) - Ensign Matrix
scottmatrixstf at gmail.com
scottmatrixstf at gmail.com
Sat Apr 17 15:41:51 UTC 2021
Mission: A Cure Delayed
Day: 5
Stardate: 2445.10.29
(USS Illuminar - Deck 11, Main Engineering - Ensign Scott Matrix- 1501)
Scott had spent the better part of the morning touring Vulcan, but he had to
get back aboard the Illuminar for his shift in engineering. He'd just
finished up a quick shower, dawned a fresh uniform and reported to
engineering. His blue PADD at the ready he reviewed today's work and systems
status.
"Nothing urgent, just routine maintenance." He said aloud.
Scott punched up the systems schematic on the primary workstation and
initiated several diagnostic routines that aligned with the planned
maintenance cycle. After several minutes, the computer displayed a warning
on one of the EPS conduits in environmental control. It was a secondary
system that had been ignored for maintenance over more pressing work. Scott
had anticipated the warning and procured the necessary replacement parts. It
would take him just under 30 minutes to complete the upgrade and test the
repair.
(USS Illuminar - Deck 12, Environmental Control - Ensign Scott Matrix- 1545)
Scott finished up the physical removal and installation of the replacement
EPS coil and secured panel A12-B. The diagnostic indicated that the repair
was well within operational parameters. Scott marked it in operation on his
PADD and headed back to engineering.
"Let's see what's next on the agenda."
(Reply none)
(Posted by Steve)
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://startrekfreedom.com/pipermail/illuminar-rpg_startrekfreedom.com/attachments/20210417/b93de0e3/attachment-0001.html>
More information about the illuminar-rpg
mailing list